Case Study

APS implements a complete Bigbox production project

Case Study

APS has been selected for the development of the most important project in the large container field that has been started worldwide in recent years.

The complete project went through the completion of all the phases in which APS is specialized.

From the strategic planning of the company, the market research, through the design of the article with challenging objectives, until now never achieved, of weight and structural behavior, to the development, execution and implementation of the entire automated production system.

A project that involves the complete automation of the Bigbox production in its different versions, including the assembly of feet and skids in its different configurations, as well as the automated stacking in the warehouse.

This facility allows the company to produce more than 70 different references of containers, customized to the real needs of the end customer in a fully automated manner.

The joint effort of all the project partners led by APS, ENGEL injection machines, Mundimold high-performance moulds, KUKA handlers, and others, has allowed us to obtain the best results worldwide in terms of the characteristics of the plastic part, weight, structural behavior and production cycle of the mould which is already lower than 100 seconds.